Pen-y-Gaer wind turbine to be 61m

This has come from the action group opposed to the turbine application: latag

THE PLANNING APPLICATION FOR THE TURBINE AT PEN-Y-GAER HAS BEEN SUBMITTED. IT IS FOR A LARGER TURBINE THAN SPECIFIED IN THE ORIGINAL SCOPING DOCUMENT. IT IS NOW 61 METRES TOTAL HEIGHT (INSTEAD OF 52.7 METRES) AND 500 KW INSTEAD OF 33O KW. PLEASE ATTEND THE LAUNCH DAY OF THE NEW LLANDOVERY RESIDENTS’ ASSOCIATION ON 12 SEPTEMBER AT RHYS PRITCHARD MEMORIAL HALL IN LLANDOVERY, FROM 10.00 AM TO 8.00 PM. THIS WILL INCLUDE A DISPLAY ON THE WIND TURBINE, AND AN OPPORTUNITY TO JOIN OUR ACTION GROUP.

 

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *